MN DOT 511 Traveler Information
MN 27 in both directions: Bridge closed, no through traffic, bridge construction, detour in operation.
MN 27 in both directions: Bridge closed.
Between 350th Avenue and County Road 47 (2 to 4 miles east of the Lastrup area). The bridge is closed. The route is closed to through traffic. Bridge construction work is in progress. A detour is in operation. Until August 31, 2018 at about 7:00PM CDT.
Last updated on July 12
MN 27 in both directions: Bridge closed.
Map of MN 27 in both directions: Bridge closed.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info