MN DOT 511 Traveler Information
US 75 in both directions: Road construction, alternating lane closures, pilot car in operation, look out for flaggers, traffic held, width limit in effect.
US 75 in both directions: Road construction.
Between MN 30 and 4th Street Northeast (Pipestone). Road construction work is in progress. There are alternating lane closures. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 12'0". Until Saturday, at about 9:00PM CDT.

Web Comment: For more information Click Here"
Last updated on May 29
US 75 in both directions: Road construction.
Map of US 75 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info