MN DOT 511 Traveler Information
Critical Reports on US 75
Map of Reports on US 75 Between MN 19 (Ivanhoe) and MN 68 (Canby). Road construction work is in progress. There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until September 20, 2019 at about 7:00PM CDT. Between MN 27; 2nd Avenue South and 5th Avenue North (Wheaton). The road is being repaved. There are alternating lane closures. Look out for flaggers. Short delays are possible. From 7:00AM CDT to 7:00PM CDT daily. Until October 1, 2019 at about 7:00PM CDT. Between County Road 184 (Wolverton) and 180th Avenue South (near Comstock). Look out for construction work. There are alternating lane closures. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Short delays are possible. Width limit 12'0". From 7:00AM CDT to 7:00PM CDT on weekdays. Until August 29, 2019 at about 7:00PM CDT. Between 150th Avenue (near Hendrum) and 245th Avenue (Halstad). The road is closed. Look out for construction work. The road is being repaved. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is a weight limit in effect. Consider using an alternate route. Vehicle length limit 100 ft. No vehicles over 20,000 lbs. Width limit 16'0". Until November 2, 2019 at about 7:00PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info