MN DOT 511 Traveler Information
US 169 - Critical Reports
Show all Road Reports on US 169
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 169
Map of Reports on US 169 Between West 150th Street and MN 41; Chestnut Boulevard (near Carver). Look out for construction work. Bridge construction work is in progress. There are alternating lane closures. Until October 31, 2019 at about 3:00PM CDT. Between West Main Street and MN 47; US 10 (Anoka). Road maintenance operations. Alternating lane closures. Left lane closed. From 9:00AM CDT to 3:30PM CDT on Tuesday and Wednesday. Starting tomorrow at 9:00AM CDT until Wednesday, at about 3:30PM CDT. Between Timber Trail Road and Earle Brown Drive (2 to 3 miles south of the Garrison area). Be aware of narrow lanes. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 9'0". Until September 20, 2019 at about 12:00PM CDT. Between County Road 450 (3 miles north of the Hill City area) and Shadywood Road (1 mile south of the Grand Rapids area). A lane is closed. Road maintenance work is in progress. Observe the signs. Until August 29, 2019 at about 5:00PM CDT. Between Nichols Avenue (near Mountain Iron) and US 53 (near Virginia). The roadway is reduced to one lane. There is a width limit in effect. Bridge construction work is in progress. Width limit 11'0". Until today at about 2:00PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info