MN DOT 511 Traveler Information
US 169 - Critical Reports
Show all Road Reports on US 169
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Critical Reports on US 169
Map of Reports on US 169 Between West 150th Street and MN 41; Chestnut Boulevard (near Carver). Look out for construction work. Bridge construction work is in progress. There are alternating lane closures. Until October 31, 2019 at about 3:00PM CDT. Between Timber Trail Road and Earle Brown Drive (2 to 3 miles south of the Garrison area). Be aware of narrow lanes. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 9'0". Until September 20, 2019 at about 12:00PM CDT. Between County Road 26 and 455th Avenue (Garrison). The roadway is reduced to one lane. Bridge maintenance work is in progress. There is a width limit in effect. Width limit 10'0". Until June 11, 2019 at about 4:00PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info