MN DOT 511 Traveler Information
Critical Reports on I-35
Map of Reports on I-35 Between Exit 131: Broadway (near Columbus) and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed. Look out for construction work. Until April 30, 2019 at about 6:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT. Between Exit 159: Rush Lake Road (Rush City) and Exit 165: MN 70 (near Rock Creek). Bridge construction work is in progress. A lane is closed intermittently. Reduce your speed. Until October 21, 2019 at about 2:00PM CDT. Between MN 194; 5th Avenue West and Exit 258 (Duluth). The right lane is closed. Utility work is in progress. Observe the signs. Until June 6, 2019 at about 2:00PM CDT.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info