MN DOT 511 Traveler Information
Plow Cameras—Statewide
Map of Statewide Between Bourgin Road (Virginia) and County Highway 21 (5 miles north of the Aurora area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Observe the signs. Width limit 11'0". Until September 10, 2019 at about 2:00PM CDT. Between Cedar Island Drive and Miller Trunk Road (near Eveleth). The roadway is reduced to one lane. There is a width limit in effect. Bridge construction work is in progress. Expect single line traffic alternating directions. Width limit 11'0". Until September 10, 2019 at about 2:00PM CDT. Between West 150th Street and MN 41; Chestnut Boulevard (near Carver). Look out for construction work. Bridge construction work is in progress. There are alternating lane closures. Until October 31, 2019 at about 3:00PM CDT. Between Exit 152: Chisago County Road 10 (Harris) and Exit 165: MN 70 (near Rock Creek). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. Width limit 11'0". Until September 19, 2019 at about 6:00PM CDT. Between Exit 266: Winona County Road 12 (1 mile west of the Dakota area) and Exit 229: Olmsted County Road 10 (Saint Charles). The roadway is reduced to one lane due to road construction work and due to bridge construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 60 MPH. Until November 15, 2019 at about 5:00PM CDT. Between I-90 (Dakota) and Jefferson Street (3 miles south of the Winona area). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 55 MPH. Until September 27, 2019 at about 8:00PM CDT. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until November 14, 2019 at about 11:45PM CDT. Between Timber Trail Road and Earle Brown Drive (2 to 3 miles south of the Garrison area). Be aware of narrow lanes. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 9'0". Until September 20, 2019 at about 12:00PM CDT. Between Seboe Road and County Road 4 (near Wrenshall). The bridge is closed. Look out for bridge demolition work. A detour is in operation. Follow the detour signs. Until July 15, 2019 at about 2:00PM CDT. Between Adams Avenue Northwest (near Wilton) and MN 197; US 71 (near Bemidji). Look out for construction work. There are alternating lane closures. The road is being repaved. Look out for flaggers. Expect delays. Until Saturday, at about 6:00PM CDT. Between US 169; Quaker Avenue and East Street (Jordan). The road is being repaved. There are alternating lane closures. A pilot car is in operation. Look out for flaggers. From 8:00AM CDT to 4:00PM CDT on weekdays. Until tomorrow at about 4:00PM CDT. Between Mill Street and US 169 (Jordan). Look out for construction work. There are alternating lane closures. A pilot car is in operation. Look out for flaggers. Until today at about 4:00PM CDT. Between County Road 137 Southeast (1 mile north of the Chatfield area) and I-90 (4 miles south of the Rochester area). The road is closed due to road construction work. Until July 30, 2019 at about 11:59PM CDT. Between 177th Avenue Northwest (near Ramsey) and Vega Drive Northwest (near Nowthen). The roadway is reduced to one lane. Look out for flaggers. Until tomorrow at about 2:00PM CDT. Between County Road 210 (near Erskine) and Southwest Mill Street (McIntosh). The roadway is shared with opposing traffic. Look out for construction work. There is a length limit in effect. There is a width limit in effect. There is a weight limit in effect. Expect delays. Width limit 11'0". Axle weight limit 20,000 lbs. Vehicle length limit 100 ft. Until July 19, 2019 at about 7:00PM CDT. Between MN 23; West McCuen Street and Wisconsin State Line. The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Observe the signals. Width limit 11'0". Until August 19, 2019 at about 2:00PM CDT. Between Exit 97: MN 114 (2 miles west of the Alexandria area) and Exit 103: MN 29 (near Alexandria). The roadway is reduced to one lane. The roadway is shared with opposing traffic. Major road construction work is in progress. Expect delays. There is a width limit in effect. Width limit 12'0". Until August 30, 2019 at about 6:00PM CDT. Between 170th Street West (near Farmington) and MN 149 (near Inver Grove Heights). Night time construction work is in progress. Look out for construction work. There are alternating lane closures. Until July 12, 2019 at about 6:30AM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and US 10 (Mounds View). The right lane is closed. Look out for construction work. Until November 14, 2019 at about 5:00PM CDT. Between Exit 36 (near Lino Lakes) and I-35; I-35E (near Forest Lake). The roadway is reduced to one lane. Major road construction work is in progress. Until October 26, 2019 at about 10:00PM CDT. Between Adams Road (1 mile north of the Floodwood area) and South Town Line Road (5 miles south of the Hibbing area). The roadway is reduced to one lane. There is a width limit in effect. There is a length limit in effect. Road construction work is in progress. Look out for flaggers. Width limit 12'0". Vehicle length limit 75 ft. Until July 22, 2019 at about 2:00PM CDT. Between MN 101; US 10 (near Elk River) and MN 95 (Princeton). Look out for mobile maintenance operations. There are alternating lane closures. From 8:00AM CDT to 5:00PM CDT on weekdays. Until Thursday, at about 5:00PM CDT. Between 900th Street and MN 960A; 7th Street (Heron Lake). The roadway is reduced to one lane because of construction work. There is a width limit in effect. There is a weight limit in effect. Width limit 11'0". No vehicles over 20,000 lbs. Until Saturday, at about 8:00AM CDT. Between Exit 175: MN 105; Oakland Avenue West (near Hayward) and Exit 146: MN 109; Broadway (near Manchester). A lane is closed due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2019 at about 5:00PM CDT. Between MN 42; County Road 18 (Kellogg) and 347th Avenue Way (1 mile north of the Lake City area). Road construction work is in progress. There are alternating lane closures because the road is being repaved. There is a width limit in effect. Width limit 11'0". Until October 25, 2019 at about 5:00PM CDT. Between County Hwy 5 (Chatfield) and I-90 (4 miles south of the Rochester area). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until September 13, 2019 at about 5:00PM CDT. Between County Highway 10 (Mounds View) and I-694 (Arden Hills). The roadway is reduced to one lane. Look out for construction work. Until July 26, 2019 at about 11:45PM CDT. Between Exit 102: MN 15; North State Street (near Fairmont) and Exit 119: US 169 (Blue Earth). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 17, 2019 at about 2:00PM CDT.
MN 102: 210556
US 75: 208574
MN 29: 212560
MN 15: 210511
US 10: 210557
MN 15: 209513
MN 23: 214561
US 61: 210504
MN 7: 210565
MN 22: 213515
MN 23: 217576
US 10: 213509
Google Static Map Image
Plow Camera Plow Camera