MN DOT 511 Traveler Information
Plow Cameras—South Central MN
Map of South Central MN Between North German Street and MN 15; County Road 21 (New Ulm). The road is closed because of construction work. A detour is in operation. Until March 20, 2019 at about 3:00PM CST. Between Jefferson Avenue and MN 295; Freeman Drive (Saint Peter). The left lane is closed due to water main work. Until today at about 5:00PM CST. Between Exit 5: 106th Street (Bloomington) and Cliff Road (Burnsville). The roadway is reduced to three lanes. Bridge construction work is in progress. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CST. Between Potter Street and Wisconsin State Line (near Red Wing). Bridge construction work is in progress. Look out for flaggers. Until March 15, 2019 at about 3:00PM CST. Between Oak Avenue North (Maple Lake) and Bolton Avenue Northwest (near Buffalo). Road maintenance work is in progress. There are alternating lane closures. Until tomorrow at about 5:00PM CST. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CST.
MN 55: 212529
MN 55: 205500
Google Static Map Image
Plow Camera Plow Camera