MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Plow Cameras—South Central MN
Map of South Central MN Between Bagley Avenue (near Faribault) and MN 99 (5 miles south of the Montgomery area). The roadway is reduced to one lane. Look out for construction work. The road is being repaved. A pilot car is in operation. Look out for flaggers. Until June 25, 2021 at about 6:00PM CDT. Between Nobles Street and County Road 33 (Worthington). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is an axle load limit in effect. Width limit 10'0". Vehicle length limit 75.00 ft. Axle weight limit 20,000.00 lbs. Until October 1, 2021 at about 6:00PM CDT. Between Shady Oak Road and MN 62 (near Edina). The road is closed. Road construction work is in progress. Until Thursday, at about 5:00AM CDT. Between Shady Oak Road and 12th Avenue North (Hopkins). The roadway is reduced to one lane. Look out for construction work. Until June 21, 2021 at about 11:45PM CDT. Between Exit 28: Hemlock Lane (near Maple Grove) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to one lane. Look out for construction work. Between Birch Street (Nicollet) and 371st Avenue (near Kasota). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until August 13, 2021 at about 5:00PM CDT. Between West River Road (near Brooklyn Park) and Coons Rapid Boulevard Ramp (near Spring Lake Park). The roadway is reduced to two lanes. Night time construction work is in progress. From 7:00PM CDT to 5:00AM CDT daily. Until Wednesday, at about 5:00AM CDT. Between Nason Parkway Northeast and I-94 (near Rogers). The roadway is reduced to one lane. Road construction work is in progress. Expect changing traffic patterns. Look out for flaggers. Until October 31, 2021 at about 12:00PM CDT. Between Southeast 44th Avenue and Southeast 54th Avenue (1 to 2 miles east of the Owatonna area). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. Until November 1, 2021 at about 5:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT. Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The road is being reconstructed. Follow the signs. There is a width limit in effect because of construction work. Width limit 13'0". Between West River Road (near Brooklyn Park) and MN 47 (near Spring Lake Park). The roadway is reduced to one lane. Until Wednesday, at about 5:00AM CDT. Between Fish Lake Road and Exit 27: I-94 (Maple Grove). The roadway is reduced to one lane. Look out for construction work. Between 280th Street East and MN 19 (near Cannon Falls). The roadway is reduced to one lane. Road construction work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. There is a length limit in effect. Vehicle length limit 75.00 ft. Width limit 8'5". Until June 19, 2021 at about 6:00PM CDT. Between Exit 28: Ramsey County Road H and Exit 30: US 10 (Mounds View). The roadway is reduced to one lane. Width limit 12'5". Until July 18, 2021 at about 5:00AM CDT. Between MN 252 and Exit 225: MN 100 (Brooklyn Center). The roadway is reduced to one lane. Bridge construction work is in progress. Until September 2, 2021 at about 5:00AM CDT. Between Exit 32: 95th Avenue (Lexington) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Between Mill Street and Kreuser Road (Jordan). The road is closed to traffic. Look out for construction work. Until June 21, 2021 at about 11:45PM CDT. Between County Road 55 and 30th Street Southwest (near Willmar). The road is closed. Bridge construction work is in progress. Follow the detour signs. Until October 1, 2021 at about 7:00PM CDT. Between Roselawn Avenue West (Falcon Heights) and County Road C2 West (Roseville). Look out for temporary traffic lights. Follow the local detour. Until Thursday, at about 12:00PM CDT. Between CR 36 and Kelly Avenue (near Cologne). The roadway is reduced to one lane. Until October 1, 2021 at about 5:00PM CDT. Between MN 21 and West 173rd Street (near Jordan). The roadway is reduced to one lane. Until Thursday, at about 6:00PM CDT. Between County Road 92 (Independence) and CR 6 (near Orono). The road is closed. Road construction work is in progress. A detour is in operation. Until September 17, 2021 at about 6:00AM CDT. Between Triangle Lane North and Creek Lane South (Jordan). The road is closed. Until July 9, 2021 at about 5:00PM CDT. Between High Street Southwest and Territorial Street West (Watertown). The road is closed. Road construction work is in progress. Follow the detour signs. Until July 11, 2021 at about 7:00PM CDT. Between MN 19 and 280th Street East (near Cannon Falls). The roadway is reduced to one lane. Road construction work is in progress. There is head to head traffic on the roadway. A truck detour is in operation. Truck restrictions are in force. Width limit 8'6". Until June 19, 2021 at about 11:45PM CDT. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between MN 56; MN 956A (Dodge Center) and MN 57 (Kasson). The roadway is reduced to one lane. Look out for construction work. Look out for flaggers. Expect delays. There is a width limit in effect. Width limit 11'0". From 6:00AM CDT to 8:30PM CDT on weekdays. Until tomorrow at about 8:30PM CDT. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). A lane is closed due to road construction work. From 4:00AM CDT to 11:00AM CDT on weekdays. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until October 1, 2021 at about 6:00PM CDT. Between US 14; 615th Avenue (near Eagle Lake) and 1st Street North (Elysian). The road is closed due to road construction work. A detour is in operation. Until July 16, 2021 at about 6:00PM CDT. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes due to road construction work. From 4:00AM CDT to 12:00PM CDT on weekdays. Between I-35W and 93rd Lane (Mounds View). The roadway is reduced to one lane. Width limit 13'0". Until July 17, 2021 at about 5:00AM CDT. Between MN 15 (Madelia) and Lilly Street (Lake Crystal). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. Vehicle length limit 70.00 ft. Width limit 11'0". Until July 14, 2021 at about 8:00AM CDT. Between Fish Lake Road and Exit 27: I-94 (Maple Grove). The roadway is reduced to one lane. Road construction work is in progress. Until July 3, 2021 at about 11:45PM CDT. Between MN 13 (near Eagan) and East Old Shakopee Road (near Richfield). There is work on the shoulder. Expect changing traffic patterns. Bridge construction work is in progress. Until July 18, 2021 at about 5:00AM CDT. Between I-494 (South Saint Paul) and Plato Boulevard (Saint Paul). The road is closed. Road construction work is in progress. Until tomorrow at about 5:00AM CDT. Between Triangle Lane North and Naylor Avenue (Jordan). The road is closed. Look out for construction work. Until July 23, 2021 at about 5:00PM CDT. Between I-94 and MN 252 (Brooklyn Center). The road is closed. Look out for bridge demolition work. Until tomorrow at about 5:00AM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed because of construction work. A detour is in operation. Until October 15, 2021 at about 5:00PM CDT. Between 190th Street East (1 mile south of the Hastings area) and US 61 (Hastings). The road is closed. Look out for construction work. Until October 15, 2021 at about 4:00PM CDT. Between Exit 29: US 169 (near Osseo) and MN 100 (Brooklyn Center). The road is closed. Look out for bridge demolition work. Until tomorrow at about 5:00AM CDT. Between Hennepin County Road 61 (Plymouth) and US 169 (near Golden Valley). A lane is blocked. Until August 30, 2021 at about 5:00PM CDT. Between Simonet Drive Northwest and Jackson Avenue Northwest (Elk River). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until November 8, 2021 at about 5:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
Google Static Map Image
Plow Camera Plow Camera