MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Plow Cameras—South Central MN
Map of South Central MN Between Bagley Avenue (near Faribault) and MN 99 (5 miles south of the Montgomery area). The roadway is reduced to one lane. Look out for construction work. The road is being repaved. A pilot car is in operation. Look out for flaggers. Until June 25, 2021 at about 6:00PM CDT. Between Exit 224: MN 42; Olmsted County Road 7 (near Eyota) and Exit 218: US 52 (3 miles west of the Eyota area). The roadway is reduced to one lane. Look out for construction work. Expect delays. There is a width limit in effect. Width limit 11'0". Until May 28, 2021 at about 5:00PM CDT. Between I-35E and Dealton Avenue (Lilydale). The roadway is reduced to one lane. Look out for construction work. Until Saturday, at about 4:00PM CDT. Between Nobles Street and I-90 (Worthington). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is an axle load limit in effect. Width limit 10'0". Vehicle length limit 75.00 ft. Axle weight limit 20,000.00 lbs. Until October 1, 2021 at about 6:00PM CDT. Between Northwest Boulevard and County Road 6 (Plymouth). The roadway is reduced to one lane. Road maintenance work is in progress. From 9:00AM CDT to 2:30PM CDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 2:30PM CDT. Between Exit 28: Hemlock Lane (near Maple Grove) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to one lane. Look out for construction work. Between Birch Street (Nicollet) and 371st Avenue (near Kasota). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until August 13, 2021 at about 5:00PM CDT. Between Yale Avenue (near Plato) and Tacoma Avenue (Norwood Young America). The roadway is reduced to one lane. Look out for construction work. From 9:00AM CDT to 3:00PM CDT on Monday and Tuesday. Until today at about 3:00PM CDT. Between Southeast 44th Avenue and Southeast 54th Avenue (1 to 2 miles east of the Owatonna area). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. Until November 1, 2021 at about 5:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT. Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The road is being reconstructed. Follow the signs. There is a width limit in effect because of construction work. Width limit 12'6". Between Exit 215: Weaver Lake Road (Maple Grove) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes. Until today at about 11:00AM CDT. Between 280th Street East and MN 19 (near Cannon Falls). The roadway is reduced to one lane. Road construction work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. There is a length limit in effect. Vehicle length limit 75.00 ft. Width limit 8'5". Until June 19, 2021 at about 11:59PM CDT. Between Exit 28: Ramsey County Road H and Exit 30: US 10 (Mounds View). The roadway is reduced to one lane. Width limit 12'5". Until July 18, 2021 at about 5:00AM CDT. Between Manning Avenue North and Exit 17: Stillwater Boulevard North (near Stillwater). The roadway is reduced to one lane. Until Friday, at about 2:00PM CDT. Between Exit 34: Shingle Creek Parkway and MN 100 (Brooklyn Center). The roadway is reduced to two lanes. Look out for construction work. Until Thursday, at about 5:00AM CDT. Between Roselawn Avenue East and Connor Avenue (Little Canada). Look out for construction work. A lane is closed. Until Friday, at about 3:00PM CDT. Between Exit 225: MN 100 and Exit 34: Shingle Creek Parkway (Brooklyn Center). A lane is closed. Until tomorrow at about 5:00AM CDT. Between MN 36 (Lauderdale) and Exit 32: 95th Avenue (Lexington). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on weekends, Wednesday, Thursday and Friday. Between Mill Street and Kreuser Road (Jordan). The road is closed to traffic. Look out for construction work. Until June 18, 2021 at about 11:45PM CDT. Between County Road 55 and 30th Street Southwest (near Willmar). The road is closed. Bridge construction work is in progress. Follow the detour signs. Until October 1, 2021 at about 7:00PM CDT. Between Exit 32: 95th Avenue (Lexington) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Between Exit 25: Ramsey County Road 88 (New Brighton) and Exit 28: Ramsey County Road H (Mounds View). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Sunday, Monday and Tuesday. Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and MN 100 (Brooklyn Center). The roadway is reduced to two lanes. Road construction work is in progress. Until Thursday, at about 8:00PM CDT. Between 313th Street West (near Northfield) and 250th Street West (2 miles south of the Farmington area). The roadway is reduced to one lane. Road maintenance work is in progress. Look out for flaggers. Until Thursday, at about 3:00PM CDT. Between County Road 92 (Independence) and May Street (Orono). The road is closed. Road construction work is in progress. Follow the detour signs. Until September 17, 2021 at about 6:00AM CDT. Between High Street Southwest and Territorial Street West (Watertown). The road is closed. Road construction work is in progress. Follow the detour signs. Until July 11, 2021 at about 7:00PM CDT. Between Triangle Lane North and Creek Lane South (Jordan). The roadway is reduced to one lane. The right turn bay is closed. Until tomorrow at about 3:30PM CDT. Between MN 19 and 280th Street East (near Cannon Falls). The roadway is reduced to one lane. Road construction work is in progress. There is head to head traffic on the roadway. Until June 19, 2021 at about 11:45PM CDT. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between Southeast 44th Avenue and I-35; US 218 (1 mile east of the Owatonna area). The roadway is reduced to one lane. Look out for construction work. Until May 28, 2021 at about 7:00PM CDT. Between Exit 207: MN 101; Main Street (near Rogers) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes due to road construction work. From 9:00AM CDT to 4:00PM CDT on weekdays. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). A lane is closed due to road construction work. From 4:00AM CDT to 11:00AM CDT on weekdays. Between Exit 226: 49th Avenue North and Exit 34: Shingle Creek Parkway (Brooklyn Center). The roadway is reduced to two lanes. Night time construction work is in progress. Until tomorrow at about 5:00AM CDT. Between US 14; 615th Avenue (near Eagle Lake) and 1st Street North (Elysian). The road is closed due to road construction work. A detour is in operation. Until July 16, 2021 at about 6:00PM CDT. Between Phelps Avenue (Wabasha) and West Grant Street (Lake City). The roadway is reduced to one lane. Look out for construction work. Look out for flaggers. Short delays are possible. There is a width limit in effect. Width limit 12'0". Until tomorrow at about 8:00PM CDT. Between Exit 5: 106th Street (Bloomington) and Cliff Road (Burnsville). The roadway is reduced to one lane. Night time construction work is in progress. Until tomorrow at about 6:00AM CDT. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes due to road construction work. From 4:00AM CDT to 12:00PM CDT on weekdays. Between Cliff Road (Burnsville) and Minnesota River (near Bloomington). The roadway is reduced to two lanes. Road construction work is in progress. Until today at about 3:00PM CDT. Between I-35W and 93rd Lane (Mounds View). The roadway is reduced to one lane. Width limit 13'0". Until July 17, 2021 at about 5:00AM CDT. Between MN 36 (Lauderdale) and Exit 36: Anoka County Road 23 / Lake Drive (Circle Pines). The roadway is reduced to one lane. Night time construction work is in progress. Between MN 13 (near Eagan) and East Old Shakopee Road (near Richfield). There is work on the shoulder. Expect changing traffic patterns. Bridge construction work is in progress. Until July 18, 2021 at about 5:00AM CDT. Between Triangle Lane North and Creek Lane South (Jordan). The roadway is reduced to one lane. Look out for construction work. Until May 26, 2021 at about 3:30PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed because of construction work. A detour is in operation. Until October 15, 2021 at about 5:00PM CDT. Between Hennepin County Road 61 (Plymouth) and US 169 (near Golden Valley). A lane is blocked. Until August 30, 2021 at about 5:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. From 7:00PM CDT to 10:00AM CDT daily. Until May 28, 2021 at about 10:00AM CDT. Between MN 40; 60th Avenue Northwest (7 miles north of the Montevideo area) and MN 40; 1st Avenue North (11 miles south of the Benson area). The road is closed. Road construction work is in progress. A detour is in operation. Until May 28, 2021 at about 8:00PM CDT. Between Simonet Drive Northwest and Jackson Avenue Northwest (Elk River). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until November 8, 2021 at about 5:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
I-90: 212576-i
MN 80: 214566-i
Google Static Map Image
Plow Camera Plow Camera