MN DOT 511 Traveler Information
Plow Cameras—Statewide
Map of Statewide Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. There is a width limit in effect. Width limit 12'0". From 7:00PM CST to 9:00AM CST daily. Until Wednesday, at about 10:30AM CST. Between East Hayden Lake Road and Miller Road (Champlin). The roadway is reduced to one lane. Road construction work is in progress. Until Monday, at about 5:00AM CST. Between Exit 13: 46th Street and Portland Avenue South (near Minneapolis). Major road construction work is in progress. Until October 22, 2021 at about 6:00PM CST. Between US 59 and Summit Avenue (Detroit Lakes). A lane is closed due to bridge construction work. Width limit 16'0". Until Wednesday, at about 7:00PM CST. Between 114th Avenue North (Champlin) and MN 610 (Osseo). The roadway is reduced to one lane. Road construction work is in progress. From 9:00AM CST to 6:00PM CST on Monday, Tuesday and Friday. Until Tuesday, at about 6:00PM CST. Between MN 610 (Osseo) and East Hayden Lake Road (Champlin). The roadway is reduced to one lane. Road construction work is in progress. Until Tuesday, at about 2:00PM CST. Between 4th Street East and 120th Street South (near Hastings). The right lane is closed. Look out for long term road construction work. Until December 9, 2017 at about 5:00PM CST.
Google Static Map Image
Plow Camera Plow Camera