MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Plow Cameras—Southeast MN
Map of Southeast MN Between Manning Avenue North and Exit 17: Stillwater Boulevard North (near Stillwater). The roadway is reduced to one lane because of construction work. From 7:00AM CST to 1:00PM CST on Monday, Tuesday, Wednesday and Thursday. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CST. Between East 26th Street and East 35th Street (Minneapolis). A lane is closed because of work on underground services. From 9:00AM CST to 3:00PM CST on Wednesday, Thursday and Friday. Between I-494 and East 66th Street (Richfield). Look out for construction work. Width limit 11'0". No vehicles over 80,000 lbs. Vehicle length limit 65 ft. Until July 15, 2022 at about 3:00PM CST. Between 4th Grant Boulevard West and Wisconsin State Line (Wabasha). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until December 22, 2021 at about 7:00PM CST. Between MN 7 (Excelsior) and MN 5 (Chanhassen). A lane is closed due to road construction work. From 8:00AM CST to 4:00PM CST on Tuesday and Wednesday. Between County Road 92 and Lake Sarah Road (Independence). There is work on the shoulder. Look out for construction work. Width limit 11'0". Until April 17, 2022 at about 3:00PM CST. Between MN 56 and MN 56; MN 956A (near Dodge Center). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2022 at about 12:00PM CST. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes because of construction work. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work.
Google Static Map Image
Plow Camera Plow Camera