MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Plow Cameras—Southeast MN
Map of Southeast MN Between 40th Avenue Southeast (1 mile east of the Rochester area) and MN 42 (Eyota). The road is closed. Bridge construction work is in progress. A detour is in operation. Until September 25, 2020 at about 5:00PM CDT. Between 2nd Street and County Road 4 (1 to 2 miles north of the Wabasha area). Road maintenance work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. Width limit 10'0". Until October 27, 2020 at about 10:00PM CDT. Between MN 62 and I-494 (near Mendota). The road is closed. Follow the detour signs. Until October 23, 2020 at about 6:00PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed due to road construction work. A detour is in operation. Until October 16, 2020 at about 5:00PM CDT. Between Old Highway 169 Boulevard and Mill Street (Jordan). The road is closed. Bridge construction work is in progress. Until October 26, 2020 at about 11:59PM CDT. Between East Centre Street and West Grant Street (Lake City). The road is closed. Look out for construction work. A detour is in operation. Short delays are possible. Overloads are not permitted. Width limit 9'0". Height limit 14'0". Vehicle length limit 75.00 ft. No vehicles over 80,000.00 lbs. Until October 28, 2020 at about 5:00PM CDT. Between County Road 56 (Le Roy) and Maple Street (Taopi). The roadway is reduced to one lane. There is head to head traffic on the roadway. There is a width limit in effect. The road is being repaved. A pilot car is in operation. Look out for flaggers. Expect delays. Width limit 12'0". Until October 16, 2020 at about 11:59PM CDT. Between Exit 266: Winona County Road 12 and Exit 270: US 61 (near Dakota). The roadway is reduced to one lane. Bridge construction work is in progress. There is a width limit in effect. Width limit 12'0". Until November 6, 2020 at about 9:00PM CDT. Between West Charles Avenue and Saint Anthony Avenue (Saint Paul). A lane is closed. Until September 28, 2020 at about 6:00PM CDT. Between 350th Street (5 miles south of the Gaylord area) and Southview Avenue South (Gaylord). The road is closed due to road construction work. A detour is in operation. Until October 13, 2020 at about 5:00PM CDT. Between 350th Street (5 miles south of the Gaylord area) and Southview Avenue South (Gaylord). The road is closed due to road construction work. A detour is in operation. Until October 13, 2020 at about 5:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The roadway is reduced to one lane. Bridge construction work is in progress. Until December 31, 2020 at about 6:00PM CDT. Between Exit 163 (near Hayward) and Exit 175: MN 105; Oakland Avenue West (near Austin). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Until November 15, 2020 at about 7:00PM CDT. Between MN 22; County Road 29 (near Mapleton) and Dogwood Avenue South (New Richland). The road is closed due to road construction work and due to bridge construction work. The road is open for local access only. A detour is in operation. Until October 2, 2020 at about 5:00PM CDT. Between I-494; I-94 and Exit 57: 10th Street North (near Oakdale). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until November 1, 2020 at about 11:59PM CDT. Between Northeast 37th Avenue (Columbia Heights) and 73rd Avenue Northeast (Fridley). The roadway is reduced to one lane. People are working in the median. Until Wednesday, at about 6:00PM CDT. Between Sherburne Avenue and Saint Anthony Avenue (Saint Paul). The roadway is reduced to one lane. Utility work is in progress. Until September 25, 2020 at about 3:00PM CDT. Between 4th Street East and 127th Street South (near Hastings). The roadway is reduced to one lane. Until today at about 11:30PM CDT. Between Yale Avenue (near Plato) and Tacoma Avenue (Norwood Young America). The roadway is reduced to one lane. Look out for construction work. Until November 1, 2020 at about 5:00AM CDT. Between West Bush Lake Road and Exit 8: East Bush Lake Road (near Edina). The roadway is reduced to two lanes. Road maintenance work is in progress. Between 5th Avenue Southwest and 2nd Avenue Southwest (Hutchinson). The road is closed to traffic. Look out for construction work. A detour is in operation. There is a width limit in effect. Short delays are possible. Width limit 11'0". Until October 31, 2020 at about 12:00PM CDT. Between MN 295; Freeman Drive and Oshawa Twp 1740 (near Kasota). The roadway is reduced to one lane due to emergency maintenance activities. Between Wentworth Avenue East and Thompson Avenue East (West Saint Paul). The roadway is reduced to one lane. Road construction work is in progress. Until October 30, 2020 at about 6:00PM CDT. Between MN 36 (Lauderdale) and Ramsey County Road D (Saint Anthony). The roadway is reduced to two lanes. Look out for construction work. Width limit 13'0". Until November 15, 2020 at about 1:00AM CDT. Between Main Street (Green Isle) and US 212 (near Hamburg). The road is closed due to road construction work. A detour is in operation. Until October 30, 2020 at about 5:00PM CDT. Between Merrywood Lane and Smithtown Road (Victoria). The road is closed. Look out for construction work. Until tomorrow at about 5:00AM CDT. Between 44th Ave Southwest and US 63; 90th Street Southeast (near Stewartville). The road is closed. Road construction work is in progress. A detour is in operation. Until October 30, 2020 at about 5:00PM CDT. Between MN 19 (Cannon Falls) and Goodwin Avenue (near New Trier). The roadway is reduced to one lane. Until October 9, 2020 at about 9:00PM CDT. Between 367th Avenue and MN 295; Freeman Drive (Kasota). The roadway is reduced to one lane due to emergency maintenance activities. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2020 at about 5:00PM CDT. Between I-35 (Clarks Grove) and 850th Avenue (Hollandale). Look out for construction work. The road is being repaved. Until November 1, 2020 at about 7:00PM CDT. Between Exit 59: Valley Creek Road (near Woodbury) and Exit 58: I-694; I-94 (near Oakdale). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until November 1, 2020 at about 5:00PM CDT. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between Riverside Avenue and Franklin Avenue (Minneapolis). The roadway is reduced to one lane. Night time construction work is in progress. Until September 25, 2020 at about 5:00AM CDT. Between East 5th Street and US 63; Plum Street (near Red Wing). The roadway is reduced to one lane. Look out for construction work. Short delays are possible. There is a width limit in effect. Width limit 14'0". Until September 25, 2020 at about 5:00PM CDT. Between King Plant Road (Oak Park Heights) and 1st Avenue South (Bayport). Be aware of narrow lanes. Look out for construction work. Width limit 10'0". Until October 17, 2020 at about 7:00AM CDT. Between County Road 44 and Smithtown Road (Victoria). A lane is closed. Until October 9, 2020 at about 6:00PM CDT. Between 347th Avenue Way and Ski Road (2 to 3 miles north of the Lake City area). The roadway is reduced to one lane. Bridge maintenance work is in progress. There is a width limit in effect. Width limit 9'0". Until Thursday, at about 4:30PM CDT. Between Emerson Avenue South (Montrose) and Railroad Avenue (Delano). The roadway is reduced to one lane. Look out for construction work. The road is being repaved. A pilot car is in operation. Look out for flaggers. Until October 2, 2020 at about 7:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Exit 216: I-494; I-694 (Maple Grove). Road construction work is in progress. Until October 31, 2020 at about 8:00PM CDT. Between Exit 102: MN 15; North State Street (near Fairmont) and Exit 119: US 169 (Blue Earth). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 9, 2020 at about 5:00PM CDT.
Google Static Map Image
Plow Camera Plow Camera