MN DOT 511 Traveler Information
Winter Driving—Southeast MN
Map of Winter Driving—Southeast MN Between Western Avenue Northwest (Faribault) and Monkey Valley Hollow (near Kenyon). There are alternating lane closures due to road construction work. A pilot car is in operation. Short delays are possible. There is a width limit in effect. Width limit 12'0". Until November 3, 2017 at about 5:00PM CDT. Between 300th Street West (near Northfield) and 255th Street West (2 miles south of the Farmington area). The road is closed to traffic. A detour is in operation. Look out for construction work. Until October 6, 2017 at about 11:45PM CDT. Between T-530 (2 miles north of the Plainview area) and US 61; County Road 18 (Kellogg). The road is closed. The bridge is closed due to road construction work. A detour is in operation. Until October 31, 2017 at about 5:00PM CDT. Between Chalupsky Avenue Southeast and Koeper Avenue (near New Prague). The road is closed. Road construction work is in progress. A detour is in operation. Until October 3, 2017 at about 12:00PM CDT. Between MN 5 and Lyman Boulevard (Chanhassen). The road is closed because of gas main work. Follow the detour signs. Until Tuesday, at about 3:00PM CDT. Between Exit 124AB: MN 62 (Edina) and Exit 125: Interlachen Road (Hopkins). The road is closed. Major road construction work is in progress. Until October 31, 2017 at about 10:00PM CDT. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until December 1, 2017 at about 4:00PM CDT. Between 30th Street South and 15th Street South (near Afton). The road is closed. Road maintenance work is in progress. Follow the detour signs. Until September 30, 2017 at about 5:00AM CDT. Between Spillway Drive and County Highway 7 (3 to 4 miles north of the Dakota area). The road is closed. The bridge is closed. Road construction work is in progress due to bridge construction work. There is a width limit in effect. Width limit 12'0". Until October 31, 2017 at about 5:00PM CDT. Between 586th Avenue and MN 22 (near Mankato). The road is closed. A detour is in operation. There is a roundabout. Until September 30, 2017 at about 4:00PM CDT. Between I-494 (Sunfish Lake) and I-35E (Mendota Heights). The road is closed because of road maintenance activities. Until October 2, 2017 at about 5:00AM CDT.
MN 60 in both directions: Alternating lane closures, due to road construction work, pilot car in operation, short delays, width limit in effect.
MN 3: Road closed to traffic, detour in operation, construction work.
MN 42 in both directions: Road closed, bridge closed, due to road construction work, detour in operation.
MN 19 in both directions: Road closed, road construction, detour in operation.
MN 41 southbound: Road closed, because of gas main work, follow the detour signs.
US 169 in both directions: Road closed, major road construction.
MN 99 in both directions: Bridge closed, bridge construction, detour in operation.
MN 95 southbound: Road closed, road maintenance operations, follow the detour signs.
US 61 in both directions: Road closed, bridge closed, road construction, due to bridge construction work, width limit in effect.
MN 83: Road closed, detour in operation, roundabout.
MN 110 westbound: Road closed, because of road maintenance activities.
Google Static Map Image
DOT Reports Closure
Normal