MN DOT 511 Traveler Information
Future Road Reports—South Central MN
Map of South Central MN Between 125th Street (near Blue Earth) and Timberwolf Lane (Winnebago). Roadway reduced to one lane due to road construction work. Width limit in effect. Look out for flaggers. Pilot car in operation. Work on the shoulder. Width limit 10'0". Starting August 20, 2018 at 6:00AM CDT until October 16, 2018 at about 3:00PM CDT. Between Galpin Boulevard and Audubon Road (near Chanhassen). Right lane closed. Road maintenance operations. Starting August 21, 2018 at 9:00AM CDT until August 21, 2018 at about 2:00PM CDT. Between County Road 11;Victoria Drive (near Victoria) and Murray Hill Road (Excelsior). Road maintenance operations. Alternating lane closures. Look out for flaggers. From 9:00AM CDT to 2:00PM CDT on Monday, Tuesday, Wednesday and Thursday. Starting August 20, 2018 at 9:00AM CDT until August 23, 2018 at about 2:00PM CDT. Between I-494 (Minnetonka) and 12th Avenue North (Hopkins). Roadway reduced to one lane. Alternating lane closures. Night time construction work. Starting tomorrow at 7:00PM CDT until Monday, at about 5:00AM CDT. Between Exit 233C and Exit 235A: Riverside Avenue (near Minneapolis). Left lane closed due to night time construction work. Starting today at 9:00PM CDT until tomorrow at about 6:00AM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and 4th Street (near Lauderdale). Road closed. Paving operations. Starting tomorrow at 9:00PM CDT until Monday, at about 5:00AM CDT. Between Exit 63B: US 61 (Newport) and Exit 66: US 52; Lafayette Freeway (South Saint Paul). Right lane closed. Night time construction work. Width limit in effect. Width limit 11'0". Starting today at 6:00PM CDT until tomorrow at about 6:00AM CDT. Between Exit 26: MN 30 (Geneva) and Exit 13: I-90 (near Albert Lea). Left lane closed due to road construction work. Width limit in effect. Width limit 12'0". Starting Monday at 7:00AM CDT until September 28, 2018 at about 5:00PM CDT. Between Plymouth Boulevard and Fernbrook Lane North (Plymouth). Roadway reduced to one lane. Alternating lane closures. Night time construction work. From 7:00PM CDT to 5:30AM CDT on Thursday, Friday and Saturday. Starting today at 7:00PM CDT until Saturday, at about 5:30AM CDT. Between MN 19; MN 5; West Main Street and 256th Lane (near Gaylord). Roadway reduced to one lane because a seal coat treatment has been applied. Look out for flaggers. Pilot car in operation. Starting August 20, 2018 at 6:00AM CDT until August 22, 2018 at about 6:00PM CDT. Between Exit 102: MN 13; Sibley Memorial Highway and Exit 103B: MN 5; West 7th Street (Lilydale). Left lane closed. Bridge inspection work is in progress. From 9:00AM CDT to 2:00PM CDT on Monday, Tuesday and Wednesday. Starting August 27, 2018 at 9:00AM CDT until August 29, 2018 at about 2:00PM CDT.
MN 65 in both directions: Right lane closed, bridge inspection work is in progress.
I-94 eastbound: Entrance ramp closed, due to night time construction work.
I-94 eastbound: Entrance ramp closed, exit ramp closed, due to night time construction work.
I-94 eastbound: Entrance ramp closed.
US 169 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, look out for flaggers, pilot car in operation, work on the shoulder.
MN 5 eastbound: Right lane closed, road maintenance operations.
MN 7 in both directions: Road maintenance operations, alternating lane closures, look out for flaggers.
I-394 westbound: Entrance ramp closed, because of road maintenance activities.
MN 7 in both directions: Roadway reduced to one lane, alternating lane closures, night time construction work.
I-94 eastbound: Left lane closed, due to night time construction work.
I-35W southbound: Road closed, paving operations.
I-494 westbound: Right lane closed, night time construction work, width limit in effect.
I-35 southbound: Left lane closed, due to road construction work, width limit in effect.
I-35E: Roadway reduced to one lane, alternating lane closures, night time construction work.
MN 55 in both directions: Roadway reduced to one lane, alternating lane closures, night time construction work.
MN 22 in both directions: Roadway reduced to one lane, because a seal coat treatment has been applied, look out for flaggers, pilot car in operation.
I-35E in both directions: Left lane closed, bridge inspection work is in progress.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info