MN DOT 511 Traveler Information
Winter Driving—Minneapolis/St. Paul
Map of Winter Driving—Minneapolis/St. Paul Between Exit 124AB: MN 62 (Edina) and Exit 125: Interlachen Road (Hopkins). The road is closed. Major road construction work is in progress. Until October 31, 2017 at about 10:00PM CDT. Between Water Street and Wisconsin State Line (Stillwater). The bridge is closed. Starting today at 10:00PM CDT until tomorrow at about 6:00AM CDT. Between I-35E (Mendota Heights) and MN 3; US 952A (Sunfish Lake). The road is closed. Look out for construction work. Until July 12, 2017 at about 11:59PM CDT.
US 169 in both directions: Road closed, major road construction.
MN 36 in both directions: Bridge closed.
MN 110 eastbound: Road closed, construction work.
Google Static Map Image
DOT Reports Closure
Normal