MN DOT 511 Traveler Information
Winter Driving—Southeast MN
Map of Winter Driving—Southeast MN Between 22nd Street South and 15th Street South (near Afton). The road is closed. Night time construction work is in progress. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until September 15, 2017 at about 6:00AM CDT. Between Exit 233A: I-35W and Exit 233B (Minneapolis). The road is closed. Road construction work is in progress. Follow the detour signs. Until tomorrow at about 5:00AM CDT. Between Exit 124AB: MN 62 (Edina) and Exit 125: Interlachen Road (Hopkins). The road is closed. Major road construction work is in progress. Until October 31, 2017 at about 10:00PM CDT. Between 102nd Street and Oak Avenue (near Waconia). The road is closed. A detour is in operation. Until August 7, 2017 at about 5:00PM CDT. Between 586th Avenue and MN 22 (near Mankato). The road is closed. A detour is in operation. There is a roundabout. Until September 15, 2017 at about 4:00PM CDT. Between Lexington Avenue South (Mendota Heights) and I-494 (Sunfish Lake). The road is closed due to road construction work. A detour is in operation. Until August 6, 2017 at about 6:00PM CDT. Between Spillway Drive and County Highway 7 (3 to 4 miles north of the Dakota area). The road is closed. The bridge is closed. Road construction work is in progress due to bridge construction work. There is a width limit in effect. Width limit 12'0". Until October 31, 2017 at about 5:00PM CDT. Between 6th Avenue Northeast (Mapleton) and 158th Street (2 miles north of the Mapleton area). The road is closed. Major road construction work is in progress. Bridge construction work is in progress. A detour is in operation. Until November 1, 2017 at about 4:00PM CDT. Between T-530 (2 miles north of the Plainview area) and US 61; County Road 18 (Kellogg). The road is closed. The bridge is closed due to road construction work. A detour is in operation. Until October 31, 2017 at about 5:00PM CDT. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 5, 2017 at about 4:00PM CDT.
MN 95 southbound: Road closed, night time construction work, detour in operation, width limit in effect.
I-94 eastbound: Road closed, road construction, follow the detour signs.
US 169 in both directions: Road closed, major road construction.
MN 5 in both directions: Road closed, detour in operation.
MN 56 in both directions: Bridge closed, due to bridge construction work, detour in operation.
MN 83: Road closed, detour in operation, roundabout.
MN 110 eastbound: Road closed, due to road construction work, detour in operation.
US 61 in both directions: Road closed, bridge closed, road construction, due to bridge construction work, width limit in effect.
MN 22: Road closed, major road construction, bridge construction, detour in operation.
MN 56 in both directions: Road closed, due to road construction work, detour in operation.
MN 42 in both directions: Road closed, bridge closed, due to road construction work, detour in operation.
MN 99 in both directions: Bridge closed, bridge construction, detour in operation.
MN 16 in both directions: Alternating lane closures, roadway reduced to one lane, temporary traffic lights, bridge maintenance operations, width limit in effect.
Google Static Map Image
DOT Reports Closure
Normal