MN DOT 511 Traveler Information
Winter Driving—Southeast MN
Map of Winter Driving—Southeast MN Between Exit 124AB: MN 62 (Edina) and Exit 125: Interlachen Road (Hopkins). The road is closed. Major road construction work is in progress. Until October 31, 2017 at about 10:00PM CDT. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 5, 2017 at about 4:00PM CDT. Between 6th Avenue Northeast (Mapleton) and Christa View Drive (2 miles south of the Mankato area). The road is closed. Major road construction work is in progress. Bridge construction work is in progress. A detour is in operation. Until October 20, 2017 at about 4:00PM CDT.
MN 149 in both directions: Road closed, utility work.
US 169 in both directions: Road closed, major road construction.
MN 56 in both directions: Bridge closed, due to bridge construction work, detour in operation.
MN 56 in both directions: Road closed, due to road construction work, detour in operation.
MN 99 in both directions: Bridge closed, bridge construction, detour in operation.
MN 22 in both directions: Road closed, major road construction, bridge construction, detour in operation.
Google Static Map Image
DOT Reports Closure
Normal