MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Cameras—Southwest MN
Map of Southwest MN Between Nobles Street and Kragness Avenue (Worthington). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is an axle load limit in effect. Width limit 10'0". Axle weight limit 20,000.00 lbs. Vehicle length limit 75.00 ft. Until October 1, 2021 at about 6:00PM CDT. Between North Van Buren Avenue and North Washington Avenue (Springfield). There is work on the shoulder. There is a width limit in effect. Width limit 11'0". Until August 6, 2021 at about 7:00PM CDT. Between 2nd Avenue Northeast (Winnebago) and Kendall Street (Vernon Center). The roadway is reduced to one lane due to road construction work. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until September 17, 2021 at about 8:00PM CDT. Between MN 30; 156th Street (near Currie) and US 14 (Garvin). The road is closed. Look out for construction work. A detour is in operation. Short delays are possible. There is a width limit in effect. Width limit 12'0". Until October 15, 2021 at about 5:00PM CDT. Between US 75 (Ortonville) and US 59 (near Holloway). The road is closed. Road construction work is in progress. A detour is in operation. Until October 17, 2021 at about 7:00PM CDT. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until October 1, 2021 at about 6:00PM CDT. Between Exit 178: MN 24 and Exit 183: Wright County Road 8 (near Clearwater). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until September 6, 2021 at about 12:00PM CDT. Between Ulrich Avenue and 10th Street (Brewster). The roadway is reduced to one lane because of emergency vehicles. Until tomorrow at about 5:00PM CDT. Between MN 67 and 310th Avenue (near Clarkfield). The road is closed. Look out for construction work. A detour is in operation. Until Monday, at about 7:00AM CDT. Between Exit 1: MN 23 (Beaver Creek) and Exit 12: US 75 (Luverne). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 10'0". Until September 2, 2021 at about 5:00PM CDT. Between Birch Street (Nicollet) and 371st Avenue (near Kasota). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until August 13, 2021 at about 5:00PM CDT. Between US 71B (near Willmar) and MN 23 (near Spicer). The roadway is reduced to one lane. Road construction work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until September 3, 2021 at about 7:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
US 14: T.H.14 EB W of T.H.169
I-94: I-94 EB W of Co Rd 8 (MP 181)
US 71: Jeffers
MN 23: Hanley Falls
US 12: Atwater
US 212: Marietta
I-94: I-94 EB E of T.H.24 (MP 180)
MN 68: Taunton
US 75: Canby
US 75: Trosky
US 12: Holloway
MN 60: Madelia
US 14: Florence
US 71: Morton
MN 9: Murdock
I-90: Blue Earth
I-90: Rushmore
I-90: Beaver Creek
MN 7: Clara City
US 212: Hector
I-90: Lakefield
MN 30: Dovray
US 212: Dawson
US 169: T.H.169 NB N of Belgrade Ave
US 14: T.H.14 WB E of T.H.169
US 75: Ortonville
US 169: T.H.169 SB @ Co Rd 71
US 12: U.S.12 (Dassel/Cokato)
US 169: Mankato
US 169: T.H.169 NB @ Riverfront Dr
US 14: T.H.14 WB @ T.H.169 NB
MN 19: Hendricks
MN 19: Winthrop
US 14: Lake Benton
MN 7: Silver Lake
I-94: I-94 EB E of T.H.24 (MP 179)
MN 68: Milroy
Google Static Map Image
Camera Camera