MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Cameras—Southwest MN
Map of Southwest MN Between Nobles Street and County Road 33 (Worthington). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is an axle load limit in effect. Width limit 10'0". Vehicle length limit 75.00 ft. Axle weight limit 20,000.00 lbs. Until October 1, 2021 at about 6:00PM CDT. Between Birch Street (Nicollet) and 371st Avenue (near Kasota). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until August 13, 2021 at about 5:00PM CDT. Between Exit 178: MN 24 and Exit 183: Wright County Road 8 (near Clearwater). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until September 6, 2021 at about 12:00PM CDT. Between County Road 55 and 30th Street Southwest (near Willmar). The road is closed. Bridge construction work is in progress. Follow the detour signs. Until October 1, 2021 at about 7:00PM CDT. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until October 1, 2021 at about 6:00PM CDT. Between US 75 (Ortonville) and US 59 (near Holloway). The road is closed. Road construction work is in progress. A detour is in operation. Until October 17, 2021 at about 7:00PM CDT. Between Franklin Street and 240th Street (Adrian). The road is closed due to road construction work and due to bridge construction work. A detour is in operation. Until July 30, 2021 at about 5:00PM CDT. Between Franklin Street and 240th Street (Adrian). The road is closed due to road construction work and due to bridge construction work. A detour is in operation. Until July 30, 2021 at about 5:00PM CDT. Between MN 15 (Madelia) and Lilly Street (Lake Crystal). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. Vehicle length limit 70.00 ft. Width limit 11'0". Until July 14, 2021 at about 8:00AM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
US 169: Mankato
I-94: I-94 EB W of Co Rd 8 (MP 181)
US 12: Atwater
I-94: I-94 EB E of T.H.24 (MP 180)
MN 60: Madelia
I-90: Blue Earth
US 12: U.S.12 (Dassel/Cokato)
US 71: Morton
US 169: T.H.169 SB @ Co Rd 71
MN 68: Taunton
MN 7: Silver Lake
I-94: I-94 EB E of T.H.24 (MP 179)
MN 23: Hanley Falls
US 212: Marietta
I-90: Lakefield
US 14: T.H.14 WB @ T.H.169 NB
US 12: Holloway
MN 19: Winthrop
US 75: Ortonville
MN 68: Milroy
MN 30: Dovray
MN 9: Murdock
US 212: Dawson
US 71: Jeffers
US 14: Lake Benton
I-90: Beaver Creek
US 169: T.H.169 NB N of Belgrade Ave
MN 7: Clara City
US 14: T.H.14 WB E of T.H.169
I-90: Rushmore
US 75: Trosky
US 14: Florence
US 212: Hector
US 169: T.H.169 NB @ Riverfront Dr
US 14: T.H.14 EB W of T.H.169
US 75: Canby
MN 19: Hendricks
Google Static Map Image
Camera Camera