MN DOT 511 Traveler Information
Named Roads with Cameras
Cameras—Statewide
Map of Statewide Between MN 93; North 5th Street and US 169 (near Henderson). Look out for flooding. The road is closed. Between US 169 (Le Sueur) and MN 19; North 5th Street (Henderson). Look out for flooding. The road is closed. Between Garfield Avenue and South Broadway Avenue (Albert Lea). Look out for flooding. Between West 150th Street and MN 41; Chestnut Boulevard (near Carver). Look out for construction work. Bridge construction work is in progress. There are alternating lane closures. Until October 31, 2019 at about 3:00PM CDT. Between Lyndale Avenue (Richfield) and I-94 (Minneapolis). Major road construction work is in progress. The road is closed. Follow the detour signs. From 10:00PM CDT to 8:00AM CDT on Friday and from 10:00PM CDT to 5:00AM CDT on weekdays. Until March 30, 2019 at about 5:00AM CDT. Between County Road 30 (1 mile north of the Elba area) and US 61 (near Minneiska). Look out for flooding. The road is closed. Use a detour where possible. Between South Front Street and French Hill Road (Saint Peter). Look out for flooding. The road is closed. Between MN 112 and US 169 (Le Sueur). Look out for flooding. The road is closed. Between Edgeton Road and Eastway Road (near Richmond). Look out for flooding. Between US 212 (2 miles south of the Madison area) and Fair Street (Madison). Look out for flooding. The road is closed. A detour is in operation. Between US 169; Chestnut Boulevard (near Carver) and East 1st Street (near Chaska). Look out for flooding. The road is closed. Between Carlson Road (Floodwood) and County Road 862 (Brookston). The roadway is reduced to one lane. Road maintenance work is in progress. Reduce your speed. Until April 18, 2019 at about 3:00PM CDT. Between County Road 21 and County Road 77 (near Odessa). Look out for flooding. Between Exit 57: 10th Street North and I-494; I-94 (near Oakdale). Night time construction work is in progress. The left lane is closed. Until tomorrow at about 6:00AM CDT. Between Cedar Ridge Road and 382nd Street (near Saint Peter). Look out for flooding. The roadway is reduced to one lane. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. There are alternating lane closures. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT.
Google Static Map Image
Camera Camera