MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Named Roads with Cameras
Cameras—Southeast MN
Map of Southeast MN Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between MN 100 and Exit 34: Shingle Creek Parkway (Brooklyn Center). The road is closed. Look out for construction work. Until tomorrow at about 5:00AM CDT. Between Exit 207: MN 101; Main Street (near Rogers) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes due to road construction work. From 9:00AM CDT to 4:00PM CDT on weekdays. Between MN 56 and MN 56; MN 956A (near Dodge Center). The roadway is reduced to one lane. Look out for construction work. Until April 30, 2021 at about 5:00PM CDT. Between US 14; 615th Avenue (near Eagle Lake) and 1st Street North (Elysian). The road is closed due to road construction work. A detour is in operation. Until July 16, 2021 at about 6:00PM CDT. Between Morse Street North and County Road 31 (Norwood Young America). The roadway is reduced to one lane. Look out for construction work. Until April 27, 2021 at about 6:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT. Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The road is being reconstructed. Follow the signs. There is a width limit in effect because of construction work. Width limit 12'6". Between MN 5; North Reform Street and County Road 31 (Norwood Young America). The roadway is reduced to one lane. Look out for construction work. Until today at about 5:00PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed because of construction work. A detour is in operation. Until October 15, 2021 at about 5:00PM CDT. Between St Charles Twp Rd 9 (near Saint Charles) and County Road 39 (Elba). The road is closed. Bridge construction work is in progress. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes due to road construction work. From 4:00AM CDT to 12:00PM CDT on weekdays. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). A lane is closed due to road construction work. From 4:00AM CDT to 11:00AM CDT on weekdays.
Google Static Map Image
Camera Camera