MN DOT 511 Traveler Information
Winter Road Conditions
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Winter Driving—South Central MN
Map of Winter Driving—South Central MN Between Exit 124AB: MN 62 (Edina) and Exit 125: Interlachen Road (Hopkins). The road is closed. Major road construction work is in progress. Until October 31, 2017 at about 10:00PM CDT. Between 220th Street and US 12 (2 miles south of the Grove City area). There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 10'0". Until May 30, 2017 at about 7:00PM CDT. Between Mendota Road East (Sunfish Lake) and Thompson Avenue East (West Saint Paul). There are alternating lane closures. Until Monday, at about 7:30PM CDT. Between MN 7 (Cedar Mills) and West Pleasure Drive (Litchfield). The road is closed. The road is being repaved. A detour is in operation. Until June 30, 2017 at about 5:00PM CDT. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 5, 2017 at about 4:00PM CDT. Between 8th Avenue South and 7th Street South (near Saint James). The road is closed to traffic. The road is being reconstructed. A detour is in operation. There is a width limit in effect. There is a weight limit in effect. Follow the detour signs. Width limit 10'0". No vehicles over 80000 lbs. Until November 6, 2017 at about 1:30PM CDT. Between Ford Avenue North and 120th Street (near Glencoe). The road is closed. Utility work is in progress. A detour is in operation. There is a width limit in effect. There is a weight limit in effect. Width limit 8'6". Until May 8, 2017 at about 4:30PM CDT. Between Exit 2AB: MN 62 and Exit 1C: 77th Street (Edina). There are alternating lane closures. The roadway is reduced to one lane. The left lane is closed. The right lane is closed. Bridge construction work is in progress. From 6:00PM CDT to 6:00AM CDT on Tuesday, Wednesday and Thursday. Until today at about 6:00AM CDT. Between 6th Avenue Northeast (Mapleton) and Christa View Drive (2 miles south of the Mankato area). The road is closed. Major road construction work is in progress. Bridge construction work is in progress. A detour is in operation. Until October 20, 2017 at about 4:00PM CDT.
US 169 in both directions: Road closed, major road construction.
MN 4 in both directions: Alternating lane closures, paving operations, pilot car in operation, look out for flaggers, traffic held, width limit in effect.
I-35W northbound: Road closed, crash investigation work.
US 952A in both directions: Alternating lane closures.
MN 22 in both directions: Road closed, paving operations, detour in operation.
MN 99 in both directions: Bridge closed, bridge construction, detour in operation.
MN 4 in both directions: Road closed to traffic, road reconstruction, detour in operation, width limit in effect, gross weight limit in effect, follow the detour signs.
MN 22 in both directions: Road closed, utility work, detour in operation, width limit in effect, gross weight limit in effect.
MN 100 southbound: Alternating lane closures, roadway reduced to one lane, left lane closed, right lane closed, bridge construction.
MN 22 in both directions: Road closed, major road construction, bridge construction, detour in operation.
Google Static Map Image
DOT Reports Closure
Normal