MN DOT 511 Traveler Information
MN 9 in both directions: Intermittent lane closure, paving operations, width limit in effect.
MN 9 in both directions: Intermittent lane closure.
Between MN 27 (Herman) and MN 55 (Nashua). A lane is closed intermittently. The road is being repaved. There is a width limit in effect. Width limit 11'6". Until June 2, 2017 at about 7:00PM CDT.

Web Comment: Culvert work ADA work in Tintah and Norcross 11.5' Width restriction begins 4/17
Last updated on April 12
MN 9 in both directions: Intermittent lane closure.
Map of MN 9 in both directions: Intermittent lane closure.
Zoom In
Zoom Out
Google Static Map Image
DOT Reports Closure
Normal