MN DOT 511 Traveler Information
Road Reports—Central MN
Map of Central MN Between Main Street and County Road 50 (Rockford). The road is closed. A detour is in operation. Utility work is in progress. Until June 21. Between Exit 20: Carlson Parkway (near Plymouth) and Exit 27: I-94 (Maple Grove). Major road construction work is in progress. There is a width limit in effect. Width limit 11'0". Until November 30. Between 30th Street Northeast (near Willmar) and Kandi-Meeker Road (Atwater). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 10'0". Until July 22. Between Exit 156: Stearns County Road 159 (near Avon) and Exit 164: MN 23 (near Saint Joseph). Expect single line traffic alternating directions. The road is being repaved. There is a width limit in effect. Width limit 12'0". Until October 5. Between Exit 164: MN 23 and Exit 167A-B: MN 15 (near Waite Park). A lane is closed. Bridge maintenance work is in progress. There is a width limit in effect. Width limit 12'0". Until August 24. Between US 71B and MN 23; US 71B (near Willmar). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until July 22. Between 250th Avenue (2 miles north of the Canby area) and US 212 (2 miles south of the Madison area). There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. Until Friday, at about 8:00PM CDT. Between Nelson Avenue (Belgrade) and 408th Street (near Sauk Centre). The roadway is reduced to one lane. The road is being repaved. There is a width limit in effect. Look out for flaggers. Width limit 12'0". Until August 3. Between County Road 10 and MN 284; South Olive Street (Waconia). The roadway is reduced to one lane. Road construction work is in progress. Width limit 11'0". Until July 1. Between West 78th Street and MN 101; Dakota Avenue (Chanhassen). Be aware of narrow lanes. Major road construction work is in progress. Width limit 9'0". Until July 30. Between County Road 5 Southwest and US 71; US 71B (near Willmar). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until July 22. Between Exit 38: Otter Tail County Road 11 and Exit 50: US 59 (near Elizabeth). A lane is closed due to bridge construction work. There is a width limit in effect. Width limit 12'0". Until October 28. Between 2nd Street Northeast and 12th Street Northeast (near Buffalo). The road is closed. A detour is in operation. Until September 21. Between MN 23 (Milaca) and County Road 19 (7 miles north of the Milaca area). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Consider using an alternate route. Width limit 10'0". Until August 17. Between MN 27 (near Onamia) and Wagidaaki Drive (4 miles south of the Garrison area). The roadway is reduced to one lane. People are working in the median. Look out for flaggers. A pilot car is in operation. Short delays are possible. Night time construction work is in progress. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 75 ft. From 7:00PM CDT to 7:00AM CDT on weekdays. Until June 18. Between County Road 19 (7 miles north of the Milaca area) and MN 27 (near Onamia). There are alternating lane closures. People are working in the median. Major road construction work is in progress. Short delays are possible. From 5:00AM CDT to 7:00PM CDT on weekdays. Until June 18. Between Lower Cullen Road (near Nisswa) and Pine Tree Avenue (Jenkins). Look out for temporary traffic lights. Until May 1, 2017. Between MN 23; Division Street (Saint Cloud) and US 10 (near Sauk Rapids). A lane is closed. The road is being repaved. Night time construction work is in progress. There is a width limit in effect. Width limit 11'0". Until August 24. Between County Road 18 and Edna Lake Road (near Nisswa). Major road construction work is in progress. The shoulder is closed. Width limit 18'0". Until May 1, 2017. Between County Road 87 Southeast and 34th Avenue West (near Alexandria). The roadway is reduced to one lane. Look out for construction work. There is a width limit in effect. Width limit 12'0". Until October 31. Between Exit 202: 60th Street Northeast (near Albertville) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes. People are working in the median. There is work on the shoulder. Until June 22. Between Deegan Drive Southeast and Deadrick Avenue Southeast (near Buffalo). The roadway is reduced to one lane. The road is being repaved. There is a width limit in effect. Width limit 12'6". Until June 8.
MN 29: Crash.
MN 55 in both directions: Road closed, detour in operation, utility work.
I-494 in both directions: Major road construction, width limit in effect.
US 12 in both directions: Roadway reduced to one lane, road construction, paving operations, pilot car in operation, look out for flaggers, traffic is being held. Expect delays, width limit in effect.
I-94 in both directions: Single line traffic - alternating directions, paving operations, width limit in effect.
I-94 eastbound: Lane closed, bridge maintenance operations, width limit in effect.
US 71 southbound: Roadway reduced to one lane, road construction, paving operations, pilot car in operation, look out for flaggers, width limit in effect.
US 75 in both directions: Alternating lane closures, paving operations, pilot car in operation, look out for flaggers, traffic is being held. Expect delays.
US 71 in both directions: Roadway reduced to one lane, paving operations, width limit in effect, look out for flaggers.
MN 5 in both directions: Roadway reduced to one lane, road construction.
MN 5 eastbound: Narrow lanes, major road construction.
I-494: Crash.
MN 23: Roadway reduced to one lane, road construction, paving operations, pilot car in operation, look out for flaggers, width limit in effect.
I-94 in both directions: Lane closed, due to bridge construction work, width limit in effect.
I-94 westbound: Vehicle spun out.
MN 25 in both directions: Road closed, detour in operation.
US 169 in both directions: Roadway reduced to two lanes, major road construction, width limit in effect, consider using an alternate route.
US 169 in both directions: Roadway reduced to one lane, work in the median, look out for flaggers, pilot car in operation, short delays, night time construction work, width limit in effect, length limit in effect.
US 169 in both directions: Alternating lane closures, work in the median, major road construction, short delays.
MN 371: Temporary traffic lights.
MN 15 in both directions: Lane closed, paving operations, night time construction work, width limit in effect.
MN 371 in both directions: Major road construction, shoulder closed.
MN 29 in both directions: Roadway reduced to one lane, construction work, width limit in effect.
I-94 in both directions: Roadway reduced to two lanes, work in the median, work on the shoulder.
US 212 westbound: Crash.
US 169 southbound: Crash.
MN 15 northbound: Crash.
MN 55 in both directions: Roadway reduced to one lane, paving operations, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info