MN DOT 511 Traveler Information
Road Reports—Statewide
Map of Statewide Between B Street and South 1st Street (near Marshall). The road is closed. Road construction work is in progress. A detour is in operation. Until September 25. Between County Road 45 (Kasota) and US 169 (Saint Peter). The road is closed. Bridge construction work is in progress. Road construction work is in progress. A detour is in operation. There is a width limit in effect. There is a height limit in effect. Height limit 15'0". Width limit 10'0". Until September 25. Between Sycamore Street and I-90 (near La Crescent). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Reduce your speed. Width limit 11'0". Speed limit 45 MPH. Until November 15. Between MN 99 (Nicollet) and US 169 (North Mankato). The road is closed. Road construction work is in progress. A detour is in operation. There is a width limit in effect. Width limit 12'0". Until September 29. Between Scandia Road (near Waconia) and Victoria Drive (Victoria). The road is closed because of construction work. Until Thursday, at about 10:00PM CDT. Between MN 40 and 11th Street Southwest (near Willmar). The roadway is reduced to one lane. Bridge construction work is in progress. Traffic is being held. Expect delays. Look out for temporary traffic lights. There is a width limit in effect. Width limit 10'0". Until October 9. Between North 77th Avenue West and South 67th Avenue West (near Proctor). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Traffic is slow. Look out for flaggers because of potholes. Width limit 11'0". Until October 14. Between US 10; 125th Avenue (near Becker) and MN 95 (1 mile south of the Foley area). A lane is closed. The road is being repaved. There is a width limit in effect. Look out for flaggers. Expect delays. Width limit 12'0". From 7:00AM CDT to 7:00PM CDT on weekdays and Saturdays. Until September 23. Between US 14 (Eyota) and 2nd Avenue Northeast (Plainview). The road is closed because of construction work. A detour is in operation. Until September 15. Between Aetna Avenue Southeast and Southeast Brighton Avenue (near Montrose). A lane is closed. The road is being repaved. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 75 ft. Until October 14. Between 5th Avenue Southwest and 2nd Avenue Northwest (Hutchinson). The roadway is reduced to one lane. Road construction work is in progress. Consider using an alternate route. Traffic is being held. Expect delays. Width limit 10'0". Until September 24. Between 182nd Street Northwest (Big Lake) and MN 101; US 169 (near Elk River). A lane is closed. People are working in the median. Until September 23. Between Division Street West and 85th Circle (near Brownton). A lane is closed. The left shoulder is closed. Reduce your speed. Look out for flaggers. Short delays are possible. Until September 15. Between Exit 17: Minnetonka Boulevard (near Minnetonka) and Exit 27: I-94 (Maple Grove). Major road construction work is in progress. Until November 30, 2016. Between MN 65 and 4th Street Southeast (Braham). A lane is closed. The road is being repaved. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until September 24. Between CR 35 and Wagidaaki Drive (4 to 6 miles south of the Garrison area). Bridge construction work is in progress. There is a width limit in effect. There are alternating lane closures. Until October 28. Between US 12 (near Montrose) and 5th Street South (Buffalo). The road is closed to traffic. A detour is in operation. The road is being repaved. There is a width limit in effect. There is a length limit in effect. Width limit 12'0". Vehicle length limit 75 ft. Until October 21. Between Exit 13: I-90 (near Albert Lea) and Exit 32: Steele County Road 4 (Ellendale). The roadway is shared with opposing traffic. The roadway is reduced to one lane because of major road construction work. Expect delays. There is a width limit in effect. Width limit 11'0". Until September 15. Between Centre Pointe Curve (Mendota) and I-35E (Lilydale). The road is closed to traffic because of major road construction work. A detour is in operation. Until September 30. Between Acorn Way and West 173rd Street (near Jordan). The roadway is reduced to one lane. Look out for construction work. There is a width limit in effect. Width limit 10'0". Until October 30. Between County Road 15 and 4th Avenue Northwest (near Roseau). Look out for construction work. A detour is in operation. There is a width limit in effect. There is a weight limit in effect. Width limit 11'0". No vehicles over 80000 lbs. Until September 11. Between Exit 21: Hennepin County Road 6 (Plymouth) and Exit 27: I-94 (Maple Grove). The roadway is reduced to two lanes. Look out for construction work. Consider using an alternate route. Until September 30. Between Travis Road and US 59 (near Marshall). The roadway is reduced to one lane. There is a width limit in effect. Bridge construction work is in progress. A mandatory speed limit is in force. Reduce your speed. Short delays are possible. The roadway is reduced to two lanes. Width limit 14'0". Truck speed limit 45 MPH. Until September 18. Between Vermilion Street and MN 23 (near Thomson). The road is closed. Between Exit 205: MN 241 and Exit 207: MN 101; Main Street (near Rogers). A lane is closed. Road construction work is in progress. There is a width limit in effect. Width limit 8'6". Until November 4. Between 85th Street Northeast and 7th Street East (near Monticello). The roadway is reduced to one lane. Look out for flaggers. Road construction work is in progress. There is a width limit in effect. Width limit 11'0". From 7:00AM CDT to 10:00AM CDT daily. Until September 23. Between Exit 272 (near Dakota) and Wisconsin State Line (La Crescent). The roadway is reduced to one lane due to bridge construction work and due to road construction work. There is a width limit in effect. There is a weight limit in effect. No vehicles over 80000 lbs. Width limit 12'0". Until November 15. Between I-35; US 218 (near Owatonna) and Southeast 54th Avenue (2 miles east of the Owatonna area). The roadway is reduced to one lane. The road is being reconstructed. There is a width limit in effect. Width limit 11'0". Until September 30. Between 368th Street and I-94; County Road 65 (near Melrose). A detour is in operation. Bridge construction work is in progress. Until September 23. Between Fairview Avenue and Wisconsin State Line (2 miles east of the Rock Creek area). The roadway is reduced to one lane. There is a width limit in effect. The roadway is reopened to traffic. Road construction work is in progress. Width limit 12'0". Until October 13. Between Ridge (1 mile west of the Grand Marais area) and Birch Drive (near Grand Marais). The shoulder is closed. There is a width limit in effect. There is a length limit in effect. Road construction work is in progress. Approach with care. Vehicle length limit 100 ft. Width limit 14'0". Until October 1. Between Exit 47: I-35E (Little Canada) and Exit 48: US 61; Maplewood Drive (near Gem Lake). Right lane closed. Road maintenance operations. Starting 7:00AM CDT, 9/1/2015 until tomorrow at about 3:00PM CDT. Between 210th Street North and Lee Street (near Forest Lake). The roadway is reduced to one lane. The left lane is closed due to road construction work. From 7:00AM CDT to 8:00PM CDT on weekdays. Until Friday, at about 8:00PM CDT. Between Kandi-Meeker Road (Atwater) and MN 22 (near Litchfield). The road is closed. A detour is in operation. There is a width limit in effect. Until September 21. Between Plato Boulevard and I-94 (near Saint Paul). Bridge construction work is in progress. Until October 16. Between US 75 (Pipestone) and Ravine (Lake Wilson). There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Short delays are possible. Until Friday, at about 8:00PM CDT. Between 200th Street (2 miles north of the Milaca area) and 290th Street (4 miles south of the Onamia area). Roadway reduced to one lane. Work in the median. Work on the shoulder. Width limit in effect. Width limit 8'6". Starting 6:00AM CDT, 9/1/2015 until November 20. Between 290th Street (4 miles south of the Onamia area) and 200th Street (2 miles north of the Milaca area). Road closed intermittently because people are working in the median and because there is work on the shoulder. Starting 6:00AM CDT, 9/1/2015 until November 20. Between 173rd Street and 29th Avenue Southwest (1 mile south of the Austin area). The road is closed to traffic because the road is being repaved. Follow the local detour. Until Friday, at about 5:00PM CDT. Between Exit 205: Pine County Road 43 (Willow River) (Willow River) and Exit 195: MN 23 (near Sandstone). The roadway is reduced to one lane. There is a width limit in effect. Road maintenance work is in progress. Width limit 12'0". Until September 14. Between MN 62; East Front Street (Fulda) and 15th Street (Slayton). There are alternating lane closures. The road is being repaved. There is work on the shoulder. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. Until September 25. Between Koecher Road (near Kerrick) and County Highway 1 (4 miles west of the Wrenshall area). The road is closed. A detour is in operation. There is a weight limit in effect. Permitted oversize loads are prohibited. Until September 22. Between Exit 5A: Excelsior Boulevard (Saint Louis Park) and Exit 8A: Glenwood (Golden Valley). Major road construction work is in progress. The roadway is reduced to two lanes. Width limit 11'0". Until November 30, 2016. Between Exit 5A-B: MN 100 (Golden Valley) and Exit 9A: I-94 (Minneapolis). Road construction work is in progress. Until October 30. Between Exit 40: US 14 and Exit 43: Airport Road (near Owatonna). The roadway is reduced to one lane because of major road construction work. There is a width limit in effect. Expect delays. The entrance ramp is closed. The exit ramp is closed. Width limit 11'0". Until November 14. Between MN 19 (Winthrop) and US 212 (Brownton). The road is closed. A detour is in operation. Until September 30. Between 135th Avenue Northeast (Ronneby) and 185th Avenue Northeast (near Foreston). A lane is closed. The road is being repaved. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until September 24. Between County Road 1 and County Road 7 (near Mazeppa). The road is closed to traffic. A detour is in operation. Bridge construction work is in progress. Until Friday, at about 8:00PM CDT. Between 14th Street East (Thief River Falls) and 400th Street Northeast (Middle River). The road is closed to traffic. There is a weight limit in effect. A detour is in operation. Vehicles with permits call for instructions. Road construction work is in progress. No vehicles over 20000 lbs. Until September 8. Between Jacobs Road and Sheep Ranch Road (9 to 13 miles north of the Orr area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Approach with care. Width limit 12'0". Until September 30. Between I-94 (Saint Paul) and Exit 112: I-694 (Little Canada). Major road construction work is in progress. Until December 31. Between Heinlen Lane and Fahrenholz Road Northeast (Longville). A lane is closed. Utility work is in progress. Until October 22. Between Exit 134: MN 253 and Exit 154: MN 13 (6 miles west of the Alden area). Road construction work is in progress. The roadway is reduced to one lane. The exit ramp is closed. Look out for construction work. There is a width limit in effect. Width limit 10'0". Until October 9. Between US 53; 2nd Avenue (International Falls) and End of Route (5 miles east of the Ranier area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Short delays are possible. Width limit 14'0". Until September 21. Between County Road 15 and 7th Avenue Southwest (near Roseau). The road is closed. Look out for construction work. A detour is in operation. There is a width limit in effect. There is a weight limit in effect. Width limit 11'0". No vehicles over 80000 lbs. Until September 14.
US 59 in both directions: Road closed, road construction, detour in operation.
MN 22 in both directions: Road closed, bridge construction, road construction, detour in operation, width limit in effect, height limit in effect.
US 61 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, reduce your speed.
I-90 westbound: Exit ramp closed, height limit in effect, width limit in effect, length limit in effect.
US 14 in both directions: Road closed, road construction, detour in operation, width limit in effect.
MN 5 in both directions: Road closed, because of construction work.
US 12 eastbound: Roadway reduced to one lane, bridge construction, traffic is being held. Expect delays, temporary traffic lights, width limit in effect.
MN 23: Roadway reduced to one lane, width limit in effect, road construction, slow traffic, look out for flaggers, because of potholes.
MN 25 in both directions: Lane closed, paving operations, width limit in effect, look out for flaggers, delays.
MN 42 in both directions: Road closed, because of construction work, detour in operation.
US 12 in both directions: Lane closed, paving operations, width limit in effect, length limit in effect.
MN 15 in both directions: Roadway reduced to one lane, road construction, consider using an alternate route, traffic is being held. Expect delays.
MN 5 in both directions: Road closed, road construction, detour in operation.
MN 36: Bridge construction, new road construction layout.
I-35W: Bridge construction.
US 10 in both directions: Lane closed, work in the median.
MN 15 in both directions: Lane closed, left shoulder closed, reduce your speed, look out for flaggers, short delays.
I-494 in both directions: Major road construction.
I-494 southbound: Exit ramp closed, entrance ramp closed, road construction.
MN 107 in both directions: Lane closed, paving operations, look out for flaggers, width limit in effect.
US 169 in both directions: Bridge construction, width limit in effect, alternating lane closures.
MN 26 in both directions: Roadway reduced to one lane, due to bridge construction work, observe signals, slow traffic, width limit in effect, short delays.
MN 25 in both directions: Road closed to traffic, detour in operation, paving operations, width limit in effect, length limit in effect.
I-35 in both directions: Opposing traffic sharing the roadway, roadway reduced to one lane, because of major road construction work, delays, width limit in effect.
MN 13 in both directions: Road closed to traffic, because of major road construction work, detour in operation.
US 169 in both directions: Roadway reduced to one lane, construction work, width limit in effect.
I-35E northbound: Exit ramp closed, because of construction work, width limit in effect.
US 59: Road construction, road closed, detour in operation.
MN 5 in both directions: Roadway reduced to one lane.
MN 11: Construction work, detour in operation, width limit in effect, gross weight limit in effect.
I-494 in both directions: Roadway reduced to two lanes, construction work, consider using an alternate route.
MN 23 in both directions: Roadway reduced to one lane, width limit in effect, bridge construction, a mandatory speed limit is in force, reduce your speed, short delays, roadway reduced to two lanes.
MN 210: Road closed.
MN 55 in both directions: Lane closed.
I-694 eastbound: Exit ramp closed, bridge construction, follow the detour signs.
I-94 in both directions: Lane closed, road construction, width limit in effect.
MN 25 in both directions: Roadway reduced to one lane, look out for flaggers, road construction, width limit in effect.
I-90 in both directions: Roadway reduced to one lane, due to bridge construction work, due to road construction work, width limit in effect, gross weight limit in effect.
US 14 in both directions: Roadway reduced to one lane, road reconstruction, width limit in effect.
I-35E southbound: Exit ramp closed.
MN 4 in both directions: Detour in operation, bridge construction.
MN 70: Roadway reduced to one lane, width limit in effect, roadway reopened to traffic, road construction.
I-35E southbound: Exit ramp closed.
I-94 westbound: Exit ramp closed, due to road construction work.
MN 61: Shoulder closed, width limit in effect, length limit in effect, road construction, approach with care.
I-694 eastbound: Right lane closed, road maintenance operations.
MN 19 in both directions: Roadway reduced to one lane, left lane closed, work on the shoulder, short delays.
US 61 in both directions: Roadway reduced to one lane, left lane closed, due to road construction work.
US 12: Road closed, detour in operation, width limit in effect.
US 52 in both directions: Bridge construction.
MN 30 in both directions: Alternating lane closures, paving operations, pilot car in operation, look out for flaggers, short delays.
US 169 northbound: Roadway reduced to one lane, work in the median, work on the shoulder, width limit in effect.
US 169 southbound: Road closed intermittently, because people are working in the median, because there is work on the shoulder.
MN 105 in both directions: Road closed to traffic, because the road is being repaved, follow local detour.
I-35 southbound: Roadway reduced to one lane, width limit in effect, road maintenance operations.
US 59 in both directions: Alternating lane closures, paving operations, work on the shoulder, pilot car in operation, look out for flaggers, traffic is being held. Expect delays.
MN 23: Road closed, detour in operation, gross weight limit in effect, permitted oversize loads are prohibited.
MN 100 in both directions: Major road construction, roadway reduced to two lanes.
I-394 in both directions: Road construction.
I-35 in both directions: Roadway reduced to one lane, because of major road construction work, width limit in effect, delays, entrance ramp closed, exit ramp closed.
MN 15: Road closed, detour in operation.
MN 23 in both directions: Lane closed, paving operations, look out for flaggers, width limit in effect.
MN 60 in both directions: Road closed to traffic, detour in operation, bridge construction.
MN 25 in both directions: Lane closed, paving operations, look out for flaggers, width limit in effect.
MN 32: Road closed to traffic, gross weight limit in effect, detour in operation, vehicles with permits - call for instructions, road construction.
MN 19 in both directions: Road closed, due to bridge construction work, detour in operation, follow the detour signs, width limit in effect.
US 53: Roadway reduced to one lane, width limit in effect, road construction, approach with care.
I-35E in both directions: Major road construction.
MN 84 in both directions: Lane closed, utility work.
US 52: Entrance ramp closed, due to road construction work.
I-90 in both directions: Road construction, roadway reduced to one lane, exit ramp closed, construction work, width limit in effect.
MN 11: Roadway reduced to one lane, width limit in effect, road construction, short delays.
MN 11: Road closed, construction work, detour in operation, width limit in effect, gross weight limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info